4.4.15 Inactive/Cold Replacement Workflow of the PCI Expansion Unit
4.4.15 Inactive/Cold Replacement Workflow of the PCI Expansion Unit
You can perform inactive/cold replacement of a PCI expansion unit in the following configuration:
- Building block configuration where two or more physical partitions are operating
Table 4-43 shows the workflow for inactive/cold replacement of a PCI expansion unit.
Table 4-43 describes the procedure for replacing a FRU while the power cords of the PCI expansion unit are disconnected.
For replacement procedures for FRUs while the power cords of the PCI expansion unit are connected, see "7.1.1 Hot Replacement" in the PCI Expansion Unit for Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Service Manual.
Table 4-43 describes the procedure for replacing a FRU while the power cords of the PCI expansion unit are disconnected.
For replacement procedures for FRUs while the power cords of the PCI expansion unit are connected, see "7.1.1 Hot Replacement" in the PCI Expansion Unit for Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Service Manual.
Work Order | Task | Reference |
---|---|---|
1 | Checking the operating condition of the system | "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains" |
2 | Confirming the PCI expansion unit to be replaced | "8.2 Troubleshooting" |
3 | Checking the operation status of the SPARC M12-2S connected to the PCI expansion unit to be replaced | PCI Expansion Unit for Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Service Manual |
4 | Powering off the physical partition containing the SPARC M12-2S connected to the PCI expansion unit requiring maintenance | "9.5.1 Stopping a Specific Physical Partition" |
5 | Switching the mode switch on the OPNL to Service | "2.3.2 OPNL Control Function" |
6 | Releasing the SPARC M12-2S requiring maintenance from the building block configuration | "9.6.1 Releasing the SPARC M12-2S From the Building Block Configuration" |
7 | Removing the FRUs in the faulty PCI expansion unit | PCI Expansion Unit for Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Service Manual |
8 | Installing a FRU in the PCI expansion unit | PCI Expansion Unit for Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Service Manual |
9 | Incorporating the SPARC M12-2S that required maintenance into the building block configuration | "10.4.1 Incorporating the SPARC M12-2S Into a Building Block Configuration" |
10 | Diagnosing the SPARC M12-2S requiring maintenance | "10.5.1 Diagnosing the SPARC M12 Hardware" |
11 | Powering on the physical partition containing the SPARC M12-2S that underwent maintenance | "10.8 Powering on a Physical Partition" (*1) |
12 | Confirming that there is no problem with the replacement PCI expansion unit | "10.5.3 Checking the FRU Status After Maintenance" |
13 | Switching the mode switch on the OPNL to Locked | "2.3.2 OPNL Control Function" |
14 | Checking the operating condition of the system | "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains" |
*1 Do not switch the mode switch on the OPNL to Locked at this point. |
< Previous Page | Next Page >