Skip to main content
  1. Home >
  2. Products >
  3. Computing Products >
  4. Servers >
  5. Fujitsu SPARC servers >
  6. Downloads >
  7. User Manuals >
  8. Fujitsu SPARC M12-2/M12-2S Service Manual >
  9. 4.4.14 Inactive/Cold Replacement Workflow of the XBU

4.4.14 Inactive/Cold Replacement Workflow of the XBU


4.4.14 Inactive/Cold Replacement Workflow of the XBU
You can perform inactive/cold replacement of the XBU in the following configuration:
  1. Building block configuration where two or more physical partitions are operating
Table 4-42 shows the workflow for inactive/cold replacement of the XBU.
Table 4-42   Inactive/Cold Replacement Procedure of the XBU
Work Order Task Reference
1 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
2 Confirming the XBU to be replaced "8.2 Troubleshooting"
3 Checking the operation status of the SPARC M12-2S that houses the XBU to be replaced "8.1.2 Checking Hardware"
4 Powering off the physical partition containing the SPARC M12-2S that houses the XBU requiring maintenance "9.5.1 Stopping a Specific Physical Partition"
5 Switching the mode switch on the OPNL to Service "2.3.2 OPNL Control Function"
6 Releasing the SPARC M12-2S requiring maintenance from the building block configuration "9.6.1 Releasing the SPARC M12-2S From the Building Block Configuration"
7 Placing the SPARC M12-2S requiring maintenance into the cold state, and removing the XBU from the SPARC M12-2S "20.3 Removing an XBU"
8 Installing the XBU in the SPARC M12-2S, and placing the SPARC M12-2S that required maintenance into the hot state "20.4 Installing an XBU"
9 Incorporating the SPARC M12-2S that required maintenance into the building block configuration "10.4.1 Incorporating the SPARC M12-2S Into a Building Block Configuration"
10 Diagnosing the XBU and crossbar cable of the SPARC M12-2S requiring maintenance "10.5.2 Diagnosing the XBU and Crossbar Cable"
11 Confirming that there is no problem with the replacement XBU "10.5.3 Checking the FRU Status After Maintenance"
12 Switching the mode switch on the OPNL to Locked, and powering on the physical partition containing the SPARC M12-2S that has undergone maintenance "10.8 Powering on a Physical Partition"
13 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"