5.5.2 System-Stopped/Hot Addition Workflow of the HDD/SSD


5.5.2 System-Stopped/Hot Addition Workflow of the HDD/SSD
Table 5-20 shows the workflow for system-stopped/hot addition of the HDD/SSD.
Table 5-20  System-Stopped/Hot Addition Procedure of the HDD/SSD
Work Order Task Reference
1 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
2 Powering off all physical partitions "9.5.2 Stopping All Physical Partitions"
3 Switching the mode switch on the OPNL to Service "2.3.2 OPNL Control Function"
4 Removing the filler unit from the SPARC M12-2/M12-2S "15.3.2 Removing a Filler Unit"
5 Installing an HDD/SSD in the SPARC M12-2/M12-2S "15.4.1 Installing an HDD/SSD"
6 Diagnosing the SPARC M12-2/M12-2S with the added HDD/SSD "10.5.1 Diagnosing the SPARC M12 Hardware"
7 Confirming that there is no problem with the added HDD/SSD "10.5.3 Checking the FRU Status After Maintenance"
8 Switching the mode switch on the OPNL to Locked "2.3.2 OPNL Control Function"
9 Powering on all physical partitions "10.9.1 Starting the System With an XSCF Command"
10 Assigning the I/O resource to a logical domain "3.2 Operations and Commands Related to Logical Domain Configurations" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Domain Configuration Guide