Skip to main content
  1. Home >
  2. Products >
  3. Computing Products >
  4. Servers >
  5. Fujitsu SPARC servers >
  6. Downloads >
  7. User Manuals >
  8. Fujitsu SPARC M12-2/M12-2S Service Manual >
  9. 5.5.1 System-Stopped/Hot Addition Workflow of a PCIe Card

5.5.1 System-Stopped/Hot Addition Workflow of a PCIe Card


5.5.1 System-Stopped/Hot Addition Workflow of a PCIe Card
Table 5-19 shows the workflow for system-stopped/hot addition of a PCIe card.
Table 5-19  System-Stopped/Hot Addition Procedure of a PCIe Card
Work Order Task Reference
1 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
2 Powering off all physical partitions "9.5.2 Stopping All Physical Partitions"
3 Switching the mode switch on the OPNL to Service "2.3.2 OPNL Control Function"
4 Removing the PCICS from the SPARC M12-2/M12-2S "12.3.1 Enabling the Removal of a PCIe Card"
5 Removing the PCIe card filler of the PCICS "12.3.2 Removing a PCIe Card or PCIe Card Filler"
6 Installing a PCIe card in the PCICS to install it in the SPARC M12-2/M12-2S "12.4.1 Installing a PCIe Card or PCIe Card Filler"
7 Diagnosing the SPARC M12-2/M12-2S with the added PCIe card "10.5.1 Diagnosing the SPARC M12 Hardware"
8 Confirming that there is no problem with the added PCIe card "10.5.3 Checking the FRU Status After Maintenance"
9 Switching the mode switch on the OPNL to Locked "2.3.2 OPNL Control Function"
10 Powering on all physical partitions "10.9.1 Starting the System With an XSCF Command"
11 Assigning the I/O resource to a logical domain "3.2 Operations and Commands Related to Logical Domain Configurations" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Domain Configuration Guide