22.4 Installing the XSCF BB Control Cable
22.4 Installing the XSCF BB Control Cable
This section describes the procedure for installing the XSCF BB control cable.
- Affix labels to the XSCF BB control cable.
Affix the labels filled out in step 2 of "22.3 Removing the XSCF BB Control Cable" to the XSCF BB control cable (Figure 22-6).
Figure 22-6 Label Affixing Positions on the XSCF BB Control Cable
|
![]() |
Note - Affix a label 5 cm (2 in.) away from the XSCF BB control cable connector. |
- Connect the XSCF BB control cable.
Figure 22-7 Connecting the XSCF BB Control Cable
|
![]() |
- Place the server in the hot state.
To perform maintenance after every SPARC M12-2S was placed in the cold state without using the maintenance menu, install the power cords of every SPARC M12-2S. For details on installing the power cord on the PSU, see "10.1.1 Installing a Power Cord."
Figure 22-8 Installing the Power Cord
|
![]() |