Skip to main content

5.1 Active/Hot Addition Workflows


5.1 Active/Hot Addition Workflows
This section describes the workflows for active/hot addition of FRUs to the SPARC M12.
Before performing addition work, be sure to check the notes on maintenance work in the Fujitsu SPARC M12 Product Notes of the XCP version used.
Each of the following sections puts together the order of work and the tasks for each FRU into a table. For details on each task, see the reference shown in the table.
The following FRUs are subject to active/hot addition: