5.6.3 System-Stopped/Cold Addition Workflow of the CMUU


5.6.3 System-Stopped/Cold Addition Workflow of the CMUU
Table 5-24 shows the workflow for system-stopped/cold addition of the CMUU.
Table 5-24  System-Stopped/Cold Addition Procedure of the CMUU
Work Order Task Reference
1 Powering off all physical partitions "9.5.2 Stopping All Physical Partitions"
2 Switching the mode switch on the OPNL to Service "2.3.2 OPNL Control Function"
3 Removing the power cords of all the SPARC M12-2/M12-2S units "9.8.2 Removing the Power Cords"
4 Removing the filler unit from the SPARC M12-2/M12-2S "17.4 Removing the CMU or Memory"
5 Installing the CMUU in the SPARC M12-2/M12-2S (*1) "17.5 Installing the CMU and Memory"
6 Connecting the power cords of all the SPARC M12-2/M12-2S units "10.1.1 Installing a Power Cord"
7 Diagnosing all the SPARC M12-2/M12-2S units "10.5.1 Diagnosing the SPARC M12 Hardware"
8 Confirming that there is no problem with the added CMUU "10.5.3 Checking the FRU Status After Maintenance"
9 Switching the mode switch on the OPNL to Locked "2.3.2 OPNL Control Function"
10 Powering on all physical partitions "10.9.1 Starting the System With an XSCF Command"
11 Assigning resources to a logical domain "3.2 Operations and Commands Related to Logical Domain Configurations" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Domain Configuration Guide
*1 If the CMUU has no memory installed, install memory before installing the CMUU in the SPARC M12-2/M12-2S.