Skip to main content
  1. Home >
  2. Products >
  3. Computing Products >
  4. Servers >
  5. Fujitsu SPARC servers >
  6. Downloads >
  7. User Manuals >
  8. Fujitsu SPARC M12-2/M12-2S Service Manual >
  9. 4.1.5 Active/Hot Replacement Workflow of the HDD/SSD

4.1.5 Active/Hot Replacement Workflow of the HDD/SSD


4.1.5 Active/Hot Replacement Workflow of the HDD/SSD
If the HDD/SSD to be replaced has a mirror volume configuration, see "Active/Hot Replacement Workflow of the HDD/SSD With a Mirror Volume Configuration."
Table 4-5 shows the workflow for active/hot replacement of the HDD/SSD.
Table 4-5  Active/Hot Replacement Procedure of the HDD/SSD
Work Order Task Reference
1 Checking the operating condition of the system and the I/O device usage status "9.2 Checking the Operation Status and Resource Usage Status of Oracle Solaris"
2 Releasing the faulty HDD/SSD from the system "9.4.2 Dynamically Releasing the HDD/SSD From a Logical Domain"
3 Removing the HDD/SSD from the SPARC M12-2/M12-2S "15.3.1 Removing an HDD/SSD"
4 Installing an HDD/SSD in the SPARC M12-2/M12-2S "15.4.1 Installing an HDD/SSD"
5 Incorporating the replacement HDD/SSD into the system "10.6.2 Incorporating an I/O Device Into the Physical Partition by Using the Hot Plug Function"
6 Confirming that there is no problem with the replacement HDD/SSD "10.5.3 Checking the FRU Status After Maintenance"
Active/Hot Replacement Workflow of the HDD/SSD With a Mirror Volume Configuration
The workflow assumes the mirror volume is configured by the hardware RAID function of the SPARC M12. If the mirror volume is configured by software RAID, enable the removal of the HDD/SSD and then replace it. For details, see the manual for the software being used.
Table 4-6 shows the workflow for active/hot replacement of the HDD/SSD with a mirror volume configuration.
Table 4-6  Active/Hot Replacement Procedure of the HDD/SSD With a Mirror Volume Configuration
Work Order Task Reference
1 Identifying the mounting location of the faulty HDD/SSD "14.2.9 Checking for a Failed Disk Drive" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 System Operation and Administration Guide
2 Removing the HDD/SSD from the SPARC M12-2/M12-2S "15.3.1 Removing an HDD/SSD"
3 Installing an HDD/SSD in the SPARC M12-2/M12-2S "15.4.1 Installing an HDD/SSD"
4 Incorporating the replacement HDD/SSD into the system "14.2.10 Replacing a Failed Disk Drive" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 System Operation and Administration Guide
5 Confirming that there is no problem with the replacement HDD/SSD "10.5.3 Checking the FRU Status After Maintenance"