Skip to main content
  1. Home >
  2. Products >
  3. Computing Products >
  4. Servers >
  5. Fujitsu SPARC servers >
  6. Downloads >
  7. User Manuals >
  8. Fujitsu SPARC M12-2/M12-2S Service Manual >
  9. 10.6.1 Incorporating the SPARC M12-2S Into the Physical Partition Using PPAR DR

10.6.1 Incorporating the SPARC M12-2S Into the Physical Partition Using PPAR DR


10.6.1 Incorporating the SPARC M12-2S Into the Physical Partition Using PPAR DR
The operation described in this section is available only with the SPARC M12-2S.
  1. Log in to the XSCF shell.
  2. Incorporate the SPARC M12-2S into the physical partition.
    The following execution example incorporates the SPARC M12-2S of BB#00 into PPAR-ID#0 by using the addboard command.
XSCF> addboard -y -c configure -p 0 00-0
PSB#00-0 will be configured into PPAR-ID 0. Continue?[y|n] :y
Start connecting PSB to PPAR. [3600sec]
0..... 30..../
PSU On (BB#00)
. 60...../
CMU Reset Start (BB#00)
90.-
XB Reset 1 (BB#00)
...\
XB Reset 2 (BB#00)
.120.|
XB Reset 3 (BB#00)
....150.....180.....210.....240...../
270....-

CPU Reset 1 (BB#00)
.300.....330|
CPU Reset 2 (BB#00)
.....360.....390..\
Reset released (BB#00)
..
POST Sequence Start (BB#00)
.420.....450.....480.....510.
POST Sequence Complete (BB#00)
..end
Connected PSB to PPAR.
Start configuring PSB to Logical Domains (LDoms) Manager. [1800sec]
0|
Processing of the incoming DR request by the LDoms Manager is pendingIncoming DR request is being processed by the LDoms ManagerDR sequence started (sequence#=4, message#=2)
DR sequence finished (sequence#=4, message#=2)
../
Processing of the incoming DR request by the LDoms Manager is pendingIncoming DR request is being processed by the LDoms ManagerDR sequence started (sequence#=5, message#=6)
../
Restoring primary succeeded, PCIE16 was assigned
. 30.
Restoring primary succeeded, PCIE17 was assigned
....-
Restoring primary succeeded, PCIE18 was assigned
60..../

Restoring primary succeeded, PCIE19 was assigned
. 90
Restoring primary succeeded, PCIE20 was assigned
../
Restoring primary succeeded, PCIE21 was assigned
...120.
Restoring primary succeeded, PCIE22 was assigned
.
Restoring primary succeeded, PCIE23 was assigned
...150.-
Restoring primary succeeded, 24 core(s) were assigned
....180.....210..-
Restoring primary succeeded, 163208757248 byte memory were assigned
DR sequence finished (sequence#=5, message#=6)
end
Configured PSB to Logical Domains (LDoms) Manager.
Operation has completed.
Note - During the maintenance using PPAR DR, you cannot restore CPU socket constraints even if you execute the addboard command with bind=resource specified in the operation mode option (-m option). Set the constraints again using the ldm command. For details on CPU socket constraints, see "8.14 Managing Logical Domain Resources Associated with CPU Sockets" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 System Operation and Administration Guide and the Oracle VM Server for SPARC Reference Manual of the version used. If resource assignments other than the CPU constraints cannot be restored, use the ldm command as well to set them again.
  1. Execute the showresult command to check the end status of the previously executed addboard command.
    If the end code is not 0, the addboard command ended abnormally. Eliminate the cause of the failure, and then execute the addboard command again.

    In the following example, "0" is returned as the end status, so you can see that the execution of the addboard command has completed correctly.
XSCF> showresult
0
Note - For information on the action to take if the addboard command ends abnormally, see "Appendix C Meanings of Messages and Corresponding Corrective Action" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Domain Configuration Guide.
  1. Check the PSB configuration of the physical partition.
    The following example executes the showboards command to check that PSB#00-0 (BB#00) has been added to PPAR-ID#00 and is running normally.
XSCF> showboards -a
PSB PPAR-ID(LSB) Assignment Pwr Conn Conf Test Fault
---- ------------ ----------- ---- ---- ---- ------- --------

00-0 00(00) Assigned y y y Passed Normal
01-0 00(01) Assigned y y y Passed Normal
02-0 00(02) Assigned y y y Passed Normal
03-0 00(03) Assigned y y y Passed Normal
  1. Check the hardware status.
    The following execution example checks the result output by the showstatus command. If the hardware is normal, the command displays nothing.
XSCF> showstatus
XSCF>
  1. Check the hardware configuration.
    Enter the showhardconf command to check that the replacement FRU has been incorporated into the system. If there is an error, an asterisk (*) appears at the beginning of the line on which the corresponding FRU name is shown.
XSCF> showhardconf
Hereinafter, perform the procedure described in "10.7 Incorporating I/O Resources Into a Logical Domain" to assign I/O resources to logical domains.
If you have replaced a FRU with the SPARC M12-2S released from the building block configuration, return the I/O configuration of the logical domains to the state it was in before maintenance.
If you have added the SPARC M12-2S to the building block configuration, assign the CPU resources, memory resources, and I/O resources as appropriate for the system configuration of the logical domains.