4.6.14 System-Stopped/Cold Replacement Workflow of the XBU


4.6.14 System-Stopped/Cold Replacement Workflow of the XBU
Table 4-65 shows the workflow for system-stopped/cold replacement of the XBU.
Table 4-65  System-Stopped/Cold Replacement Procedure of the XBU
Work Order Task Reference
1 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
2 Confirming the XBU to be replaced "8.2 Troubleshooting"
3 Checking the operation status of the SPARC M12-2S that houses the XBU to be replaced "10.5.2 Diagnosing the XBU and Crossbar Cable"
4 Stopping all physical partitions "9.5.2 Stopping All Physical Partitions"
5 Switching the mode switch on the OPNL to Service "2.3.2 OPNL Control Function"
6 Removing the power cords of all the SPARC M12-2S units "9.8.2 Removing the Power Cords"
7 Removing the XBU from the SPARC M12-2S "20.3 Removing an XBU"
8 Installing the XBU in the SPARC M12-2S "20.4 Installing an XBU"
9 Installing the power cords on all the SPARC M12-2S units "10.1.1 Installing a Power Cord"
10 Diagnosing all the SPARC M12-2S units "10.5.1 Diagnosing the SPARC M12 Hardware"
11 Confirming that there is no problem with the replacement XBU "10.5.3 Checking the FRU Status After Maintenance"
12 Switching the mode switch on the OPNL to Locked "2.3.2 OPNL Control Function"
13 Powering on the physical partitions "10.9.1 Starting the System With an XSCF Command"
14 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"