Skip to main content

Chapter 10 Setting Up the System


Chapter 10 Setting Up the System
This chapter describes the system setup work to be done after a FRU is replaced, added, or removed or after the building block configuration is changed. See this chapter, as required, after replacing, adding, or removing a FRU.