Skip to main content
  1. Home >
  2. Products >
  3. Computing Products >
  4. Servers >
  5. Fujitsu SPARC servers >
  6. Downloads >
  7. User Manuals >
  8. Fujitsu SPARC M12-2/M12-2S Service Manual >
  9. 4.4.1 Inactive/Cold Replacement Workflow of the XSCFU

4.4.1 Inactive/Cold Replacement Workflow of the XSCFU


4.4.1 Inactive/Cold Replacement Workflow of the XSCFU
You can perform inactive/cold replacement of the XSCFU in the following configuration:
  1. Building block configuration where two or more physical partitions are operating
Table 4-29 shows the workflow for inactive/cold replacement of the XSCFU.
Table 4-29   Inactive/Cold Replacement Procedure of the XSCFU
Work Order Task Reference
1 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
2 Confirming the XSCFU to be replaced "8.2 Troubleshooting"
3 Confirming that the XSCFU to be replaced is the standby or slave XSCF and is currently replaceable (*1) "Table 2-16 XSCFU LEDs and Their States"
4 Powering off the physical partition containing the SPARC M12-2S that houses the XSCFU to be replaced "9.5.1 Stopping a Specific Physical Partition"
5 Switching the mode switch on the OPNL to Service "2.3.2 OPNL Control Function"
6 Releasing the SPARC M12-2S requiring maintenance from the building block configuration "9.6.1 Releasing the SPARC M12-2S From the Building Block Configuration"
7 Placing the SPARC M12-2S requiring maintenance into the cold state "9.8.2 Removing the Power Cords"
8 Removing the XSCFU from the SPARC M12-2S "11.4 Removing the XSCFU"
9 Switching the SD card (*2) "11.5 Switching an SD Card"
10 Installing the XSCFU in the SPARC M12-2S "11.6 Installing the XSCFU"
11 Placing the SPARC M12-2S that required maintenance into the hot state "10.1.1 Installing a Power Cord"
12 Incorporating the SPARC M12-2S that required maintenance into the building block configuration "10.4.1 Incorporating the SPARC M12-2S Into a Building Block Configuration"
13 Confirming that there is no problem with the replacement XSCFU "10.5.3 Checking the FRU Status After Maintenance"
14 Switching the mode switch on the OPNL to Locked, and powering on the physical partition containing the SPARC M12-2S that has undergone maintenance "10.8 Powering on a Physical Partition"
15 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
*1 Before replacing the XSCFU, confirm that the READY LED of the XSCFU is lit in green or off. If the READY LED of the XSCFU is blinking, wait until the LED stays lit or is turned off.
- If the XSCFU requiring replacement is not running when the physical partition containing the XSCFU is powered on, perform active/hot replacement.
- If the physical partition containing the XSCFU requiring replacement is powered off, you can perform hot replacement of the XSCFU even when it is not running. In that case, proceed to step 5.

*2 If the SD card installed in the maintenance part will be used, this work is not required.