5.2.3 Active/Cold Addition Workflow of the CMUU


5.2.3 Active/Cold Addition Workflow of the CMUU
You can perform active/cold addition of the CMUU in the following configuration:
  1. Configuration connecting two or more SPARC M12-2S units to a physical partition
Table 5-6 shows the workflow for active/cold addition of the CMUU.
Table 5-6  Active/Cold Addition Procedure of the CMUU
Work Order Task Reference
1 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
2 Checking the logical domain assignment status of CPU resources mounted in the SPARC M12-2S requiring maintenance "3.2.4 Checking the Assignment Status of Resources" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Domain Configuration Guide
3 Checking the logical domain assignment status of memory resources mounted in the SPARC M12-2S requiring maintenance "3.2.4 Checking the Assignment Status of Resources" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Domain Configuration Guide
4 Releasing the logical domain assignment of PCIe cards mounted in the SPARC M12-2S requiring maintenance "9.3 Releasing I/O Resources From a Logical Domain"
5 Releasing the SPARC M12-2S requiring maintenance from the physical partition "9.4.3 Dynamically Releasing the SPARC M12-2S From the Physical Partition"
6 Switching the mode switch on the OPNL to Service "2.3.2 OPNL Control Function"
7 Releasing the SPARC M12-2S requiring maintenance from the building block configuration, and removing the power cords "9.6.1 Releasing the SPARC M12-2S From the Building Block Configuration"
"9.8.2 Removing the Power Cords"
8 Removing the filler unit from the SPARC M12-2S "17.4 Removing the CMU or Memory"
9 Installing the CMUU in the SPARC M12-2S (*1) "17.5 Installing the CMU and Memory"
10 Installing the power cords on the SPARC M12-2S with the added CMUU, and incorporating it into the building block configuration "10.1.1 Installing a Power Cord"
"10.4.1 Incorporating the SPARC M12-2S Into a Building Block Configuration"
11 Diagnosing the SPARC M12-2S requiring maintenance (*2) "10.5.1 Diagnosing the SPARC M12 Hardware"
12 Diagnosing the XBU and crossbar cable of the SPARC M12-2S requiring maintenance "10.5.2 Diagnosing the XBU and Crossbar Cable"
13 Confirming that there is no problem with the added CMUU "10.5.3 Checking the FRU Status After Maintenance"
14 Incorporating the SPARC M12-2S into the physical partition "10.6.1 Incorporating the SPARC M12-2S Into the Physical Partition Using PPAR DR"
15 Switching the mode switch on the OPNL to Locked "2.3.2 OPNL Control Function"
16 Assigning the resources of the added SPARC M12-2S to logical domains "3.2 Operations and Commands Related to Logical Domain Configurations" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Domain Configuration Guide
*1 If the CMUU has no memory installed, install memory before installing the CMUU in the SPARC M12-2S.
*2 If the CMU was added to a SPARC M12-2S with no PCIe cards mounted, no diagnosis is necessary (because diagnosis was performed in the previous step).