5.1.3 Active/Hot Addition Workflow of the PCI Expansion Unit
5.1.3 Active/Hot Addition Workflow of the PCI Expansion Unit
Before adding the PCI expansion unit, mount it in the rack. (See "3.3 Mounting the SPARC M12-2 and the PCI Expansion Unit in a Rack" in the Fujitsu SPARC M12-2 Installation Guide or "3.4 Mounting the SPARC M12-2S and the PCI Expansion Unit in a Rack" in the Fujitsu SPARC M12-2S Installation Guide.)
Table 5-3 shows the workflow for active/hot addition of the PCI expansion unit.
Table 5-3 shows the workflow for active/hot addition of the PCI expansion unit.
Work Order | Task | Reference |
---|---|---|
1 | Checking the operating condition of the system | "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains" |
2 | Switching the mode switch on the OPNL to Service | "2.3.2 OPNL Control Function" |
3 | Removing the PCICS from the SPARC M12-2/M12-2S | "12.3.1 Enabling the Removal of a PCIe Card" |
4 | Removing the PCIe card filler from the PCICS | "12.3.2 Removing a PCIe Card or PCIe Card Filler" |
5 | Installing the link card in the PCICS | "12.4.1 Installing a PCIe Card or PCIe Card Filler" |
6 | Installing the link card in the SPARC M12-2/M12-2S | "12.4.2 Incorporating a PCIe Card Into the System" |
7 | Connecting a PCI expansion unit to the link card | "4.2 Connecting Cables to the PCI Expansion Unit" in the Fujitsu SPARC M12-2 Installation Guide or "5.2 Connecting Cables to the PCI Expansion Unit" in the Fujitsu SPARC M12-2S Installation Guide |
8 | Incorporating the added PCI expansion unit into the system (*1) | "10.6.2 Incorporating an I/O Device Into the Physical Partition by Using the Hot Plug Function" |
9 | Confirming that there is no problem with the added PCI expansion unit | "10.5.3 Checking the FRU Status After Maintenance" |
10 | Installing all the PCIe cards to be mounted in the PCI expansion unit | "8.4 Installing a PCI Express Card" in the PCI Expansion Unit for Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Service Manual |
11 | Incorporating all the PCIe cards installed in the PCI expansion unit into the system | "10.6.2 Incorporating an I/O Device Into the Physical Partition by Using the Hot Plug Function" |
12 | Confirming that there is no problem with the added PCI expansion unit | "10.5.3 Checking the FRU Status After Maintenance" |
13 | Switching the mode switch on the OPNL to Locked | "2.3.2 OPNL Control Function" |
14 | Assigning the I/O resource to a logical domain | "3.2 Operations and Commands Related to Logical Domain Configurations" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Domain Configuration Guide |
*1 The direct I/O function needs to be disabled. Do not mount any PCIe card in the PCI expansion unit during active addition of the PCI expansion unit. |
< Previous Page | Next Page >