4.6.8 System-Stopped/Cold Replacement Workflow of the OPNL


4.6.8 System-Stopped/Cold Replacement Workflow of the OPNL
Table 4-59 shows the workflow for system-stopped/cold replacement of the OPNL.
Table 4-59  System-Stopped/Cold Replacement Procedure of the OPNL
Work Order Task Reference
1 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
2 Confirming the OPNL to be replaced "8.2 Troubleshooting"
3 Checking the operation status of the SPARC M12-2/M12-2S that houses the OPNL to be replaced "2.4 Understanding the LED Indications"
4 Stopping all physical partitions "9.5.2 Stopping All Physical Partitions"
5 Switching the mode switch on the OPNL to Service "2.3.2 OPNL Control Function"
6 Removing the power cords of all the SPARC M12-2/M12-2S units "9.8.2 Removing the Power Cords"
7 Removing the OPNL from the SPARC M12-2/M12-2S "16.3 Removing the HDDBPU or OPNL"
8 Installing the OPNL on the SPARC M12-2/M12-2S "16.4 Installing the HDDBPU or OPNL"
9 Installing the power cords on all the SPARC M12-2/M12-2S units "10.1.1 Installing a Power Cord"
10 Diagnosing all the SPARC M12-2/M12-2S units "10.5.1 Diagnosing the SPARC M12 Hardware"
11 Confirming that there is no problem with the replacement OPNL "10.5.3 Checking the FRU Status After Maintenance"
12 Switching the mode switch on the OPNL to Locked "2.3.2 OPNL Control Function"
13 Powering on the physical partitions "10.9.1 Starting the System With an XSCF Command"
14 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"