22.2 Before Maintenance on the XSCF BB Control Cable
22.2 Before Maintenance on the XSCF BB Control Cable
When replacing the XSCF BB control cable, perform one of the maintenance procedures listed below.
When implementing a building block configuration by connecting multiple SPARC M12-2S units for a system that uses only one SPARC M12-2S unit, check the connection destinations of the XSCF BB control cable in "Appendix A Lists of Cable Connections in a Building Block Configuration."
When implementing a building block configuration by connecting multiple SPARC M12-2S units for a system that uses only one SPARC M12-2S unit, check the connection destinations of the XSCF BB control cable in "Appendix A Lists of Cable Connections in a Building Block Configuration."
< Previous Page | Next Page >