Skip to main content
  1. Home >
  2. Products >
  3. Computing Products >
  4. Servers >
  5. Fujitsu SPARC servers >
  6. Downloads >
  7. User Manuals >
  8. Fujitsu SPARC M12-2/M12-2S Service Manual >
  9. 4.5.5 System-Stopped/Hot Replacement Workflow of the HDD/SSD

4.5.5 System-Stopped/Hot Replacement Workflow of the HDD/SSD


4.5.5 System-Stopped/Hot Replacement Workflow of the HDD/SSD
Table 4-50 shows the workflow for system-stopped/hot replacement of the HDD/SSD.
Table 4-50  System-Stopped/Hot Replacement Procedure of the HDD/SSD
Work Order Task Reference
1 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
2 Confirming the HDD/SSD to be replaced "8.2 Troubleshooting"
3 Checking the operation status of the SPARC M12-2/M12-2S that houses the HDD/SSD to be replaced "Table 2-22 HDD/SSD LEDs and Their States"
4 Stopping all physical partitions "9.5.2 Stopping All Physical Partitions"
5 Switching the mode switch on the OPNL to Service "2.3.2 OPNL Control Function"
6 Removing the HDD/SSD from the SPARC M12-2/M12-2S "15.3.1 Removing an HDD/SSD"
7 Installing an HDD/SSD in the SPARC M12-2/M12-2S "15.4.1 Installing an HDD/SSD"
8 Powering on the physical partitions "10.9.1 Starting the System With an XSCF Command"
9 Confirming that there is no problem with the replacement HDD/SSD "10.5.3 Checking the FRU Status After Maintenance"
10 Switching the mode switch on the OPNL to Locked "2.3.2 OPNL Control Function"
11 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"