6.1.2 Active/Hot Removal Workflow of the HDD/SSD


6.1.2 Active/Hot Removal Workflow of the HDD/SSD
Before removing the HDD/SSD, see "Precautions for HDD/SSD removal" in "7.3 Precautions for FRU Reduction."
Table 6-2 shows the workflow for active/hot removal of the HDD/SSD.
Table 6-2  Active/Hot Removal Procedure of the HDD/SSD
Work Order Task Reference
1 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
2 Checking the usage status of the HDD/SSD to be removed "9.2.3 Checking the Usage of the HDD/SSD"
3 Releasing the HDD/SSD from the system "9.4 Enabling the Removal of Hardware"
4 Confirming that you can remove the HDD/SSD to be removed "9.2.3 Checking the Usage of the HDD/SSD"
5 Saving logical domain configuration information "9.1.1 Saving Logical Domain Configuration Information"
6 Switching the mode switch on the OPNL to Service "2.3.2 OPNL Control Function"
7 Removing the HDD/SSD from the SPARC M12-2/M12-2S "15.3.1 Removing an HDD/SSD"
8 Checking the operating condition of the physical partition and logical domains (*1) "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
9 Installing the filler unit in the SPARC M12-2/M12-2S "15.4.2 Installing a Filler Unit"
10 Switching the mode switch on the OPNL to Locked "2.3.2 OPNL Control Function"
*1 Reassign I/O resources to logical domains as required. For details, see "Chapter 3 Operations for Domain Configuration" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Domain Configuration Guide.