Skip to main content
  1. Home >
  2. Products >
  3. Computing Products >
  4. Servers >
  5. Fujitsu SPARC servers >
  6. Downloads >
  7. User Manuals >
  8. Fujitsu SPARC M12-2/M12-2S Service Manual >
  9. 4.6.11 System-Stopped/Cold Replacement Workflow of the BPU

4.6.11 System-Stopped/Cold Replacement Workflow of the BPU


4.6.11 System-Stopped/Cold Replacement Workflow of the BPU
Table 4-62 shows the workflow for system-stopped/cold replacement of the BPU.
Table 4-62  System-Stopped/Cold Replacement Procedure of the BPU
Work Order Task Reference
1 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
2 Confirming the BPU to be replaced "8.2 Troubleshooting"
3 Checking the operation status of the SPARC M12-2/M12-2S that houses the BPU to be replaced "8.1.2 Checking Hardware"
4 Stopping all physical partitions "9.5.2 Stopping All Physical Partitions"
5 Switching the mode switch on the OPNL to Service "2.3.2 OPNL Control Function"
6 Removing the power cords of all the SPARC M12-2/M12-2S units "9.8.2 Removing the Power Cords"
7 Removing the BPU from the SPARC M12-2/M12-2S "18.4 Removing the BPU and PSUBP"
8 Installing the BPU in the SPARC M12-2/M12-2S "18.5 Installing the BPU and PSUBP"
9 Installing the power cords on all the SPARC M12-2/M12-2S units "10.1.1 Installing a Power Cord"
10 Diagnosing all the SPARC M12-2/M12-2S units "10.5.1 Diagnosing the SPARC M12 Hardware"
11 Confirming that there is no problem with the replacement BPU "10.5.3 Checking the FRU Status After Maintenance"
12 Switching the mode switch on the OPNL to Locked "2.3.2 OPNL Control Function"
13 Powering on the physical partitions "10.9.1 Starting the System With an XSCF Command"
14 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"