Skip to main content
  1. Home >
  2. Products >
  3. Computing Products >
  4. Servers >
  5. Fujitsu SPARC servers >
  6. Downloads >
  7. User Manuals >
  8. Fujitsu SPARC M12-2/M12-2S Service Manual >
  9. 4.3.3 Inactive/Hot Replacement Workflow of the PSU

4.3.3 Inactive/Hot Replacement Workflow of the PSU


4.3.3 Inactive/Hot Replacement Workflow of the PSU
You can perform inactive/hot replacement of the PSU in the following configuration:
  1. Building block configuration where two or more physical partitions are operating
Table 4-25 shows the workflow for inactive/hot replacement of the PSU.
Table 4-25  Inactive/Hot Replacement Procedure of the PSU
Work Order Task Reference
1 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
2 Confirming the PSU to be replaced "8.2 Troubleshooting"
3 Checking the operation status of the SPARC M12-2S that houses the PSU to be replaced "Table 2-20 PSU LEDs and Their States"
4 Powering off the physical partition containing the SPARC M12-2S that houses the FRU requiring maintenance "9.5.1 Stopping a Specific Physical Partition"
5 Switching the mode switch on the OPNL to Service "2.3.2 OPNL Control Function"
6 Releasing the PSU from the SPARC M12-2S "9.6.3 Releasing the PSU"
7 Removing the PSU from the SPARC M12-2S "13.3 Removing a PSU"
8 Installing a PSU in the SPARC M12-2S "13.4 Installing a PSU"
9 Incorporating the PSU into the SPARC M12-2S "10.4.3 Incorporating the PSU"
10 Confirming that there is no problem with the replacement PSU "10.5.3 Checking the FRU Status After Maintenance"
11 Switching the mode switch on the OPNL to Locked, and powering on the physical partition containing the SPARC M12-2S that has undergone maintenance "10.8 Powering on a Physical Partition"
12 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"