Skip to main content
  1. Home >
  2. Products >
  3. Computing Products >
  4. Servers >
  5. Fujitsu SPARC servers >
  6. Downloads >
  7. User Manuals >
  8. Fujitsu SPARC M12-2/M12-2S Service Manual >
  9. 4.5.1 System-Stopped/Hot Replacement Workflow of the XSCFU

4.5.1 System-Stopped/Hot Replacement Workflow of the XSCFU


4.5.1 System-Stopped/Hot Replacement Workflow of the XSCFU
You can perform system-stopped/hot replacement of the XSCFU in the following configuration:
  1. Building block configuration connecting two or more SPARC M12-2S units
Table 4-46 shows the workflow for system-stopped/hot replacement of the XSCFU.
Table 4-46  System-Stopped/Hot Replacement Procedure of the XSCFU
Work Order Task Reference
1 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
2 Confirming the XSCFU to be replaced "8.2 Troubleshooting"
3 Confirming that the XSCFU to be replaced is the standby or slave XSCF and is currently replaceable (*1) "Table 2-16 XSCFU LEDs and Their States"
4 Stopping all physical partitions "9.5.2 Stopping All Physical Partitions"
5 Switching the mode switch on the OPNL to Service "2.3.2 OPNL Control Function"
6 Releasing the XSCFU from the SPARC M12-2S "9.6.4 Releasing the XSCFU"
7 Removing the XSCFU from the SPARC M12-2S "11.4 Removing the XSCFU"
8 Switching the SD card (*2) "11.5 Switching an SD Card"
9 Installing the XSCFU in the SPARC M12-2S "11.6 Installing the XSCFU"
10 Incorporating the XSCFU into the SPARC M12-2S "10.4.4 Incorporating the XSCFU"
11 Confirming that there is no problem with the replacement XSCFU "10.5.3 Checking the FRU Status After Maintenance"
12 Switching the mode switch on the OPNL to Locked "2.3.2 OPNL Control Function"
13 Powering on the physical partitions "10.9.1 Starting the System With an XSCF Command"
14 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
*1 Before replacing the XSCFU, confirm that the READY LED of the XSCFU is lit in green or off. If the READY LED of the XSCFU is blinking, wait until the LED stays lit or is turned off.
- If the XSCFU requiring replacement is not running when the physical partition containing the XSCFU is powered on, perform active/hot replacement.
- If the physical partition containing the XSCFU requiring replacement is powered off, you can perform hot replacement of the XSCFU even when it is not running. In that case, proceed to step 5.

*2 If the SD card installed in the maintenance part will be used, this work is not required.