Skip to main content
  1. Home >
  2. Products >
  3. Computing Products >
  4. Servers >
  5. Fujitsu SPARC servers >
  6. Downloads >
  7. User Manuals >
  8. Fujitsu SPARC M12-2/M12-2S Service Manual >
  9. 5.4.1 Inactive/Cold Addition Workflow of a PCIe Card

5.4.1 Inactive/Cold Addition Workflow of a PCIe Card


5.4.1 Inactive/Cold Addition Workflow of a PCIe Card
You can perform inactive/cold addition of a PCIe card in the following configuration:
  1. Building block configuration where two or more physical partitions are operating
Table 5-13 shows the workflow for inactive/cold addition of a PCIe card.
Table 5-13  Inactive/Cold Addition Procedure of a PCIe Card
Work Order Task Reference
1 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
2 Powering off the physical partition containing the SPARC M12-2S requiring maintenance "9.5.1 Stopping a Specific Physical Partition"
3 Switching the mode switch on the OPNL to Service "2.3.2 OPNL Control Function"
4 Releasing the SPARC M12-2S requiring maintenance from the building block configuration, and removing the power cords "9.6.1 Releasing the SPARC M12-2S From the Building Block Configuration"
"9.8.2 Removing the Power Cords"
5 Removing the PCICS from the SPARC M12-2S "12.3.1 Enabling the Removal of a PCIe Card"
6 Removing the PCIe card filler from the PCICS "12.3.2 Removing a PCIe Card or PCIe Card Filler"
7 Installing a PCIe card in the PCICS to install it in the SPARC M12-2S "12.4.1 Installing a PCIe Card or PCIe Card Filler"
8 Installing the power cords on the SPARC M12-2S with the added PCIe card, and incorporating it into the building block configuration "10.1.1 Installing a Power Cord"
"10.4.1 Incorporating the SPARC M12-2S Into a Building Block Configuration"
9 Diagnosing the SPARC M12-2S with the added PCIe card "10.5.1 Diagnosing the SPARC M12 Hardware"
10 Confirming that there is no problem with the added PCIe card "10.5.3 Checking the FRU Status After Maintenance"
11 Switching the mode switch on the OPNL to Locked "2.3.2 OPNL Control Function"
12 Powering on the physical partition of the added PCIe card "10.9.1 Starting the System With an XSCF Command"
13 Assigning the I/O resource to a logical domain "3.2 Operations and Commands Related to Logical Domain Configurations" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Domain Configuration Guide