Skip to main content
  1. Home >
  2. Products >
  3. Computing Products >
  4. Servers >
  5. Fujitsu SPARC servers >
  6. Downloads >
  7. User Manuals >
  8. Fujitsu SPARC M12-2/M12-2S Service Manual >
  9. 5.1.2 Active/Hot Addition Workflow of the HDD/SSD

5.1.2 Active/Hot Addition Workflow of the HDD/SSD


5.1.2 Active/Hot Addition Workflow of the HDD/SSD
Table 5-2 shows the workflow for active/hot addition of the HDD/SSD.
Table 5-2  Active/Hot Addition Procedure of the HDD/SSD
Work Order Task Reference
1 Checking the operating condition of the system "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains"
2 Switching the mode switch on the OPNL to Service "2.3.2 OPNL Control Function"
3 Removing the filler unit from the SPARC M12-2/M12-2S "15.3.2 Removing a Filler Unit"
4 Installing an HDD/SSD in the SPARC M12-2/M12-2S "15.4.1 Installing an HDD/SSD"
5 Incorporating the added HDD/SSD into the system "When incorporating the HDD/SSD" in "10.6.2 Incorporating an I/O Device Into the Physical Partition by Using the Hot Plug Function"
6 Confirming that there is no problem with the added HDD/SSD "10.5.3 Checking the FRU Status After Maintenance"
7 Switching the mode switch on the OPNL to Locked "2.3.2 OPNL Control Function"
8 Assigning the I/O resource to a logical domain "3.2 Operations and Commands Related to Logical Domain Configurations" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Domain Configuration Guide