This section describes the workflows for inactive/hot and inactive/cold FRU installation. References to detailed descriptions are written in the workflow. See any of them as required. You can perform inactive addition work only for a system with a building block configuration.
Inactive addition has the following patterns:
Inactive/hot addition (for an internal disk or PCIe card)
Inactive/hot addition can be performed on an internal disk and a PCIe card. Perform the following procedure to install the unit.
Figure 7-18  Inactive/hot addition flow (for an internal disk or PCIe card)
Figure 7-18  Inactive/hot addition flow (for an internal disk or PCIe card)
Table 7-19  Inactive/hot addition work procedure (for an internal disk or PCIe card)
Item Work procedure Reference
1 Opening the rack door  
2 Switching the mode switch on the operation panel to Service mode "5.2 Switching the Mode Switch to Service Mode"
3 Checking the operating condition of the system and the I/O device usage status "5.3 Checking the Operating Condition and Resource Usage Status"
4 Powering off the chassis requiring maintenance "5.5 Powering Off the Physical Partition Requiring Maintenance"
5 Lowering the cable support for maintenance on a PCIe card "5.9.2 Lowering the cable support"
6 Installing the target FRU See the installation procedures for each FRU.
"8.3 FRU Removal and Installation Flow"
"10.3 FRU Removal and Installation Flow"
7 Securing the cable support after maintenance on a PCIe card "6.1.2 Fixing the cable support"
8 Diagnosing the installed FRU "6.3.1 Diagnosing the system board"
9 Confirming that there is no problem with the installed FRU "6.3.3 Checking the FRU status after maintenance"
10 Returning the mode switch on the operation panel to Locked mode "6.6 Returning the Mode Switch to Locked Mode"
11 Powering on the chassis requiring maintenance "6.7 Powering On the Physical Partition Requiring Maintenance"
12 Closing the rack door  
Inactive/cold addition (building block configuration only)
Inactive/cold addition can be performed on the CPU memory unit upper, a PCI Express card, memory, and an internal disk in a building block configuration. Perform the following procedure to install the unit.
Figure 7-19  Inactive/cold addition flow (building block configuration only)
Figure 7-19  Inactive/cold addition flow (building block configuration only)
Table 7-20  Inactive/cold addition work procedure (building block configuration only)
Item Work procedure Reference
1 Opening the rack door  
2 Switching the mode switch on the operation panel to Service mode "5.2 Switching the Mode Switch to Service Mode"
3 Checking the operating condition of the system and the I/O device usage status "5.3 Checking the Operating Condition and Resource Usage Status"
4 Powering off the chassis requiring maintenance "5.5 Powering Off the Physical Partition Requiring Maintenance"
5 Releasing the chassis requiring maintenance from the system "5.8.1 Releasing of the SPARC M10-4S chassis (possible only in a system with a building block configuration)"
6 Enabling access to the FRU requiring maintenance "5.9 Accessing a FRU"
7 Installing the target FRU See the installation work procedures for each FRU.
"8.3 FRU Removal and Installation Flow"
"9.4 FRU Removal and Installation Flow"
"10.3 FRU Removal and Installation Flow"
8 Restoring the chassis requiring maintenance "6.1 Restoring the Chassis"
9 Incorporating the chassis requiring maintenance into the system "6.2.1 Incorporation of the SPARC M10-4S chassis (possible only in a system with a building block configuration)"
10 Diagnosing the chassis requiring maintenance "6.3.1 Diagnosing the system board" (*1)
"6.3.2 Diagnosing the crossbar unit and crossbar cables"
11 Confirming that there is no problem with the installed FRU "6.3.3 Checking the FRU status after maintenance"
12 Returning the mode switch on the operation panel to Locked mode "6.6 Returning the Mode Switch to Locked Mode"
13 Powering on the chassis requiring maintenance "6.7 Powering On the Physical Partition Requiring Maintenance"
14 Closing the rack door  