Manual Code: C120-0025-09
Fujitsu M10-4S/SPARC M10-4S Installation Guide
Contents
- Preface
- Chapter 1 Understanding the Installation Flow
- Chapter 2 Planning and Preparing for System Installation
2.1 Safety Precautions
2.2 Items Requiring Confirmation before Installation
2.3 Confirming the Physical Specifications of the System
2.4 Confirming Rack Specifications
2.5 Checking Environmental Conditions
2.6 Checking Acoustic Noise Levels
2.7 Checking Cooling Conditions
2.8 Checking the Power Input Type
2.9 Preparing Power Supply Facilities
2.10 Checking External Interface Port Specifications
2.11 Checking the Functions of the Operation Panel
- Chapter 3 Installing the System
- Chapter 4 Configuring Building Block Connections
- Chapter 5 Connecting Cables to the Chassis
- Chapter 6 Performing an Initial System Diagnosis
- Chapter 7 Making the Initial System Settings
7.1 Setting the Password Policy
7.2 Setting a User Account and Password
7.3 Configuring the Telnet/SSH Service
7.4 Configuring the HTTPS Service
7.5 Configuring the XSCF Network
7.6 Configuring Memory Mirroring
7.7 Creating a Physical Partition Configuration List (PCL)
7.8 Assigning a System Board (PSB) to a Physical Partition (PPAR)
7.9 Setting a CPU Operational Mode for the Physical Partition
7.10 Synchronizing the Physical Partition (PPAR) Time and XSCF Time
7.11 Registering a CPU Activation Key
7.12 Assigning CPU Core Resources to a Physical Partition
7.13 Starting and Stopping a Physical Partition (PPAR)
7.14 Saving Configuration Information
- Chapter 8 Before Expanding/Reducing a System with a Building Block Configuration
- Chapter 9 Expanding a System with a Building Block Configuration
- Chapter 10 Removing a System with a Building Block Configuration
- Appendix A Troubleshooting
- Appendix B Cable Connection Information on Building Block Configurations
B.1 2BB Configuration (Direct Connections between Chassis)
B.2 3BB Configuration (Direct Connections between Chassis)
B.3 4BB Configuration (Direct Connections between Chassis)
B.4 2BB Configuration to 8BB Configuration (Connections through Crossbar Boxes)
B.5 9BB Configuration to 16BB Configuration (Connections through Crossbar Boxes)
B.6 Power Cord Connections in Expansion Racks
- Appendix C Setup Command Workflow
- Appendix D Installation Procedure Checklist