3.2.1 Confirming the delivered components of the SPARC M10-4S
3.2.1 Confirming the delivered components of the SPARC M10-4S
This section describes the confirmation of delivered components of the SPARC M10-4S.
Name | Quantity | Remarks |
---|---|---|
SPARC M10-4S chassis | 1 | (*1) |
Fujitsu M10/SPARC M10 Systems Getting Started Guide | 1 | |
Fujitsu M10/SPARC M10 Systems Important Legal and Safety Information | 1 | |
CPU Activation CD-ROM | 1 | (*2) |
Power cord | 2 | For 200 VAC (*3) |
Serial cable | 1 | |
Rack mount kit | 1 set |
(*1) |
Cable support | 1 set |
(*1) |
*1 If the chassis is shipped mounted on a rack, this component is mounted on the rack. *2 The disk contains the CPU Activation key information. One disk is supplied with the system. *3 The power cord is ordered separately (required option), so it may not come with the product. |
Name | Quantity | Remarks |
---|---|---|
Crossbar cable (electrical) | (*1) | Electrical cable connected between crossbar units |
XSCF BB control cable (2 m) | (*2) | Cable connected between XSCF units |
XSCF DUAL control cable | 1 | Cable connected between XSCF units of the master XSCF and standby XSCF |
*1 There are 8 cables for the 2BB configuration, 24 cables for the 3BB configuration, and 48 cables for the 4BB configuration. *2 There is 1 cable for the 2BB configuration, 3 cables for the 3BB configuration, and 5 cables for the 4BB configuration. |
Note - In a configuration with an expansion rack, the crossbar cables (optical), XSCF BB control cables, and XSCF DUAL control cable are already laid in the rack. For details, see "3.2.3 Confirming the delivered components of an expansion rack." |
- Check for incomplete engagement, incomplete contact, or looseness in the mounting of an internal disk that may have been caused by vibration during transportation or moving of the equipment. Also confirm that the PCI cassette lever is locked at the top.