D.3 From Installation of a Crossbar Box Connection Configuration to Initial Diagnosis


D.3 From Installation of a Crossbar Box Connection Configuration to Initial Diagnosis
Table D-3  Work descriptions and references (crossbar box connection)
Work description Check Checked by Installation Guide reference
1. Before installing the system, check the safety precautions, system specifications, and necessary conditions for installation. [   ]   "Chapter 2 Planning and Preparing for System Installation"
2. Prepare the necessary tools/information for installation. [   ]   "3.1 Preparing the Necessary Tools/Information for Installation"
3. Confirm the delivered components. [   ]   "3.2.1 Confirming the delivered components of the SPARC M10-4S"
  [   ]   "3.2.2 Confirming the delivered components of the PCI expansion unit"
    [   ]   "3.2.3 Confirming the delivered components of an expansion rack"
4. Connect the power cables of the SPARC M10-4S and crossbar boxes to a power distribution box (PDU) in an expansion rack. [   ]   "3.3.1 Connecting the power cords to the power distribution units of an expansion rack"
5. Install an expansion rack.
In a configuration with two expansion racks, connect the racks to each other.
[   ]   "3.3.2 Securing the rack"
"3.3.3 Connecting racks"
6. Confirm that each unit is connected.
At this time, confirm that the PCI cassette lever is locked.
[   ]    
7. If there are optional components, mount them on the SPARC M10-4S and the PCI expansion unit.
(For details, see the service manual.)
[   ]   "3.5.1 Mounting optional components in the SPARC M10-4S"
"3.5.2 Mounting optional components in the PCI expansion unit"

In the Fujitsu M10-4/Fujitsu M10-4S/SPARC M10-4/SPARC M10-4S Service Manual:
"Chapter 8 Maintaining the PCI Express Cards"
"Chapter 9 Maintaining the CPU Memory Unit/Memory"
"Chapter 10 Maintaining the Internal Disks"
8. Check the identification ID of each SPARC M10-4S. [   ]   "Chapter 4 Configuring Building Block Connections"
"4.1 Setting the ID (BB-ID) Identifying a Chassis"
"2.4.3 Mounting conditions for expansion racks"

9. Confirm that the XSCF BB control cable, XSCF Dual control cable, and crossbar cables (optical) are connected between the SPARC M10-4S and the crossbar box. [   ]   "4.3.1 Connecting XSCF cables"
"4.3.2 Connecting crossbar cables"
10. In a configuration with two expansion racks connected, connect the crossbar cables (optical) and XSCF BB control cable that pass between the expansion racks. [   ]   "4.3.1 Connecting XSCF cables"
"4.3.2 Connecting crossbar cables"
11. Connect serial cables (*1) and LAN cables to each crossbar box and each SPARC M10-4S. [   ]   "5.1 Connecting Cables to the SPARC M10-4S"
12. Connect the link cable and management cable to the PCI expansion unit and the SPARC M10-4S.
Attach the core to the power cord, and connect the power cord to the PCI expansion unit.
[   ]   "5.2 Connecting Cables to the PCI Expansion Unit"
13. In a configuration with two expansion racks connected, store the cables that span the racks. [   ]   "5.4 Storing Cables"
"5.4.1 Rack with a width of 700 mm (27.6 in.)"
14. Connect the system management terminal to the crossbar box of the master XSCF. [   ]   "6.1 Connecting the System Management Terminal to the Chassis"
15. Check the BB-ID setting. [   ]   "6.2.1 Checking the BB-ID setting"
16. Turn on the input power, and check the status from the LED display on the XSCF unit. [   ]   "6.2.2 Turning on the input power and starting the XSCF"
17. Log in to the master XSCF. [   ]   "6.3 Logging In to the XSCF"
18. Check the XCP version. [   ]   "6.4 Checking the XCP Version"
19. Set the altitude. [   ]   "6.5 Checking the Altitude Setting"
 * There is no need to set the altitude if it is unknown
20. Set the time. [   ]   "6.6 Checking the Time Setting"
21. Perform the initial diagnosis test. [   ]   "6.7 Performing a Diagnosis Test"
 The probe-scsi-all command and the show-devs command are displayed as command options in the diagnosis test.

 Confirm that the installed disk capacity and number of units, and the installation position and device name of the PCI Express card are correct.
22. Confirm that that each component is normally recognized, and no errors occur. [   ]   "6.8 Checking the Component Status"
*1 Connect the serial cables to the serial ports of the SPARC M10-4S operating as the master XSCF.