9.3.3 System-Stopped Reduction
9.3.3 System-Stopped Reduction
This section describes the method of reducing by stopping all physical partitions. Perform the work in accordance with the procedure of the reference.
Before starting the work, be sure to see "9.1 Points of Concern During Reduction."
Before starting the work, be sure to see "9.1 Points of Concern During Reduction."
Procedure | Work Description | Reference | |
---|---|---|---|
1 | Confirm the flow of system-stopped reduction work. | Required | |
2 | Confirm the system running status. | "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains" in the Fujitsu SPARC M12-2/M12-2S Service Manual | Required |
3 | Check the I/O device usage status of the SPARC M12-2S to be removed. | "9.2.2 Checking the Assignment Status of I/O Devices" in the Fujitsu SPARC M12-2/M12-2S Service Manual | Required |
4 | Check the HDD/SSD usage status of the SPARC M12-2S to be removed. | "9.2.3 Checking the Usage of the HDD/SSD" in the Fujitsu SPARC M12-2/M12-2S Service Manual | Required |
5 | Release the assignment of I/O resources to logical domains of the SPARC M12-2S to be removed. | "9.3 Releasing I/O Resources From a Logical Domain" in the Fujitsu SPARC M12-2/M12-2S Service Manual | Optional (*1) |
6 | Confirm the system running status. | "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains" in the Fujitsu SPARC M12-2/M12-2S Service Manual | Required (*2) |
7 | Save the logical domain configuration information. | "9.1.1 Saving Logical Domain Configuration Information" in the Fujitsu SPARC M12-2/M12-2S Service Manual | Required |
8 | Turn off the power of all physical partitions. | "7.12.4 Stopping All Physical Partitions (PPARs)" | Required |
9 | Turn the OPNL mode switch to Service mode. | "2.11 Checking the Functions of the Operation Panel" | Required |
10 | Release the SPARC M12-2S to be removed, from the building block configuration. | "7.8.2 Releasing a Specific Physical System Board (PSB) From a Physical Partition (PPAR)" "9.7 Removing the SPARC M12-2S" in the Fujitsu SPARC M12-2/M12-2S Service Manual |
Required (*3)(*5) |
11 | Turn the OPNL mode switch to Locked mode. | "2.11 Checking the Functions of the Operation Panel" | Required |
12 | Turn on the power of all physical partitions. | "7.12.2 Starting All Physical Partitions (PPARs)" | Required |
13 | Confirm the system running status. | "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains" in the Fujitsu SPARC M12-2/M12-2S Service Manual | Required (*2) |
14 | Save the logical domain configuration information. | "9.1.1 Saving Logical Domain Configuration Information" in the Fujitsu SPARC M12-2/M12-2S Service Manual | Required |
15 | Remove the chassis targeted for reduction. When removing from the rack, follow the reverse procedure of mounting. | "3.4.1 Mounting the SPARC M12-2S in a Rack" | Required (*4)(*5) |
*1 When the reduction of SPARC M12-2S gives no impact to logical domains, this is not necessary. *2 Reconfigure the logical domains as necessary. For details, see the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Domain Configuration Guide. *3 Before executing the initbb command, you need to confirm the chassis serial number from the system board to be released by executing the showhardconf command. *4 The removed SPARC M12-2S will be at the factory default status after the execution of the initbb command. If you want to use it as another system, see "1.1 Workflows for the SPARC M12-2S" to perform installation. *5 To disconnect expansion rack 2, it is necessary to remove the cables interconnecting the racks. In addition, disconnect expansion rack 1 and expansion rack 2 if necessary. |
< Previous Page | Next Page >