8.3.2 Inactive Expansion
8.3.2 Inactive Expansion
This section describes the method for SPARC M12-2S expansion by stopping the target physical partition (PPAR). Perform the work in accordance with the procedure of the reference.
Procedure | Work Description | Reference | |
---|---|---|---|
1 | Confirm the flow of inactive expansion. | Required | |
2 | Confirm the system running status. | "9.2.1 Checking the Operation Status of Physical Partitions and Logical Domains" in the Fujitsu SPARC M12-2/M12-2S Service Manual | Required |
3 | Turn the mode switch of OPNL to Service mode. | "2.11 Checking the Functions of the Operation Panel" | Required |
4 | Stop the physical partition to be incorporated. | "7.12.5 Stopping a Specific Physical Partition (PPAR)" | Required |
5 | Add a CPU Activation key to the system. | "7.10.3 Registering a CPU Activation Key" | Optional |
6 | Execute the showsscp command to check the SSCP IP address. Execute the setsscp command as needed to set the IP address. | "7.5.4 Setting an SSCP IP Address" | Optional |
7 | Execute the addfru command to incorporate an added SPARC M12-2S into a building block configuration. The work of incorporation includes the following: - Mounting the SPARC M12-2S in a rack - Setting an ID number (BB-ID) - Connecting a crossbar cable - Connecting the XSCF BB control cable and XSCF DUAL control cable - Connecting the LAN cable and power cords |
"8.4 Incorporating the SPARC M12-2S to be Added" | Required |
8 | Perform the initial diagnosis on the added SPARC M12-2S. | "8.5 Initial Diagnosis of the SPARC M12-2S to be Added" | Required |
9 | Confirm the configuration of the added SPARC M12-2S. | "6.8 Checking the Status of Components" | Required |
10 | Turn the mode switch of OPNL to Locked mode. | "2.11 Checking the Functions of the Operation Panel" | Required |
11 | Configure the XSCF network. The setting is unnecessary when expanding with multiple units (BB#02 or later). | "7.5.2 Setting an Ethernet (XSCF-LAN) IP Address" "7.5.3 Setting a Takeover IP Address" |
Optional |
12 | To configure memory mirroring for the added SPARC M12-2S, set memory mirror mode. | "7.6 Configuring Memory Mirroring" | Optional |
13 | Execute the setpcl command to create a PPAR configuration list. | "7.7 Creating a PPAR Configuration List" | Required |
14 | Register a CPU Activation key with the system. | "7.10 Registering a CPU Activation Key" | Optional |
15 | Set the number of CPU Activations in the physical partition and assign CPU core resources. | "7.11 Assigning CPU Core Resources" | Optional |
16 | Assign the SPARC M12-2S (physical system board (PSB)) to a physical partition. | "7.8.1 Assigning a Physical System Board (PSB) to a Physical Partition (PPAR)" | Required |
17 | Power on the physical partition of the added SPARC M12-2S. | "7.12.3 Starting a Specific Physical Partition (PPAR)" | Required |
18 | Confirm the system running status. | "10.5.3 Checking the FRU Status After Maintenance" in the Fujitsu SPARC M12-2/M12-2S Service Manual | Required |
19 | Assign the resources of the added SPARC M12-2S to the logical domain. | "3.2 Operations and Commands Related to Logical Domain Configurations" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Domain Configuration Guide | Required |
< Previous Page | Next Page >