Manual Code: C120-0023-12
Fujitsu SPARC M12-2S Installation Guide
Contents
- Preface
- Chapter 1 Understanding the Installation Flow
- Chapter 2 Planning and Preparing for System Installation
- 2.1 Safety Precautions
- 2.2 Items Requiring Confirmation Before Installation
- 2.3 Confirming the Physical Specifications of the System
- 2.4 Confirming Rack Specifications
- 2.5 Checking Environmental Conditions
- 2.6 Checking Acoustic Noise Levels
- 2.7 Checking Cooling Conditions
- 2.8 Checking the Power Input Type
- 2.9 Preparing Power Supply Facilities
- 2.10 Checking External Interface Port Specifications
- 2.11 Checking the Functions of the Operation Panel
- Chapter 3 Installing the System
- Chapter 4 Setting the SPARC M12-2S in a Building Block Configuration
- Chapter 5 Connecting Cables to the SPARC M12-2S and the PCI Expansion Unit
- Chapter 6 Performing an Initial System Diagnosis
- Chapter 7 Making the Initial System Settings
- 7.1 Setting the Password Policy
- 7.2 Setting a User Account and Password
- 7.3 Configuring the Telnet/SSH Service
- 7.4 Configuring the HTTPS Service
- 7.5 Configuring the XSCF Network
- 7.6 Configuring Memory Mirroring
- 7.7 Creating a PPAR Configuration List
- 7.8 Assigning/Releasing a Physical System Board (PSB) for a Physical Partition (PPAR)
- 7.9 Synchronizing the Physical Partition (PPAR) Time and XSCF Time
- 7.10 Registering a CPU Activation Key
- 7.11 Assigning CPU Core Resources
- 7.12 Starting and Stopping a Physical Partition (PPAR)
- 7.13 Installing Oracle Solaris
- 7.14 Saving Configuration Information
- Chapter 8 Expanding a System With a Building Block Configuration
- Chapter 9 Reducing a System With a Building Block Configuration
- Appendix A Troubleshooting
- Appendix B Cable Connection Information on Building Block Configurations
- B.1 2BB Configuration (Direct Connections Between Chassis)
- B.2 3BB Configuration (Direct Connections Between Chassis)
- B.3 4BB Configuration (Direct Connections Between Chassis)
- B.4 From the 2BB Configuration to 8BB Configuration (Connections via a Crossbar Box)
- B.5 From the 9BB Configuration to 16BB Configuration (Connections via a Crossbar Box)
- B.6 Power Cord Connections in Expansion Racks
- Appendix C Setup Command Workflow
- Appendix D Installation Procedure Checklist