Manual Code: C120-0023-12
Fujitsu SPARC M12-2S Installation Guide
Contents
- Preface
- Chapter 1 Understanding the Installation Flow
- Chapter 2 Planning and Preparing for System Installation
2.1 Safety Precautions
2.2 Items Requiring Confirmation Before Installation
2.3 Confirming the Physical Specifications of the System
2.4 Confirming Rack Specifications
2.5 Checking Environmental Conditions
2.6 Checking Acoustic Noise Levels
2.7 Checking Cooling Conditions
2.8 Checking the Power Input Type
2.9 Preparing Power Supply Facilities
2.10 Checking External Interface Port Specifications
2.11 Checking the Functions of the Operation Panel
- Chapter 3 Installing the System
- Chapter 4 Setting the SPARC M12-2S in a Building Block Configuration
- Chapter 5 Connecting Cables to the SPARC M12-2S and the PCI Expansion Unit
- Chapter 6 Performing an Initial System Diagnosis
- Chapter 7 Making the Initial System Settings
7.1 Setting the Password Policy
7.2 Setting a User Account and Password
7.3 Configuring the Telnet/SSH Service
7.4 Configuring the HTTPS Service
7.5 Configuring the XSCF Network
7.6 Configuring Memory Mirroring
7.7 Creating a PPAR Configuration List
7.8 Assigning/Releasing a Physical System Board (PSB) for a Physical Partition (PPAR)
7.9 Synchronizing the Physical Partition (PPAR) Time and XSCF Time
7.10 Registering a CPU Activation Key
7.11 Assigning CPU Core Resources
7.12 Starting and Stopping a Physical Partition (PPAR)
7.13 Installing Oracle Solaris
7.14 Saving Configuration Information
- Chapter 8 Expanding a System With a Building Block Configuration
- Chapter 9 Reducing a System With a Building Block Configuration
- Appendix A Troubleshooting
- Appendix B Cable Connection Information on Building Block Configurations
B.1 2BB Configuration (Direct Connections Between Chassis)
B.2 3BB Configuration (Direct Connections Between Chassis)
B.3 4BB Configuration (Direct Connections Between Chassis)
B.4 From the 2BB Configuration to 8BB Configuration (Connections via a Crossbar Box)
B.5 From the 9BB Configuration to 16BB Configuration (Connections via a Crossbar Box)
B.6 Power Cord Connections in Expansion Racks
- Appendix C Setup Command Workflow
- Appendix D Installation Procedure Checklist