Skip to main content
  1. Home >
  2. Products >
  3. Computing Products >
  4. Servers >
  5. Fujitsu SPARC servers >
  6. Downloads >
  7. User Manuals >
  8. Fujitsu SPARC M12-2S Installation Guide

Manual Code: C120-0023-12

Fujitsu SPARC M12-2S Installation Guide

Contents

  1. Preface
  2. Chapter 1 Understanding the Installation Flow
    1. Click 1.1 Workflows for the SPARC M12-2S
    2.  1.2 Workflow at Expansion With the PCI Expansion Unit
  3. Chapter 2 Planning and Preparing for System Installation
    1.  2.1 Safety Precautions
    2.  2.2 Items Requiring Confirmation Before Installation
    3. Click 2.3 Confirming the Physical Specifications of the System
    4. Click 2.4 Confirming Rack Specifications
    5. Click 2.5 Checking Environmental Conditions
    6.  2.6 Checking Acoustic Noise Levels
    7.  2.7 Checking Cooling Conditions
    8. Click 2.8 Checking the Power Input Type
    9. Click 2.9 Preparing Power Supply Facilities
    10. Click 2.10 Checking External Interface Port Specifications
    11.  2.11 Checking the Functions of the Operation Panel
  4. Chapter 3 Installing the System
    1.  3.1 Preparing the Necessary Tools/Information for Installation
    2. Click 3.2 Confirming Delivered Components
    3. Click 3.3 Installing the Rack
    4. Click 3.4 Mounting the SPARC M12-2S and the PCI Expansion Unit in a Rack
    5. Click 3.5 Mounting Optional Components
  5. Chapter 4 Setting the SPARC M12-2S in a Building Block Configuration
    1.  4.1 Setting the ID (BB-ID) Identifying the SPARC M12-2S
    2. Click 4.2 Connecting XSCF Cables
    3. Click 4.3 Connecting Crossbar Cables
    4. Click 4.4 Storing Crossbar Cables
  6. Chapter 5 Connecting Cables to the SPARC M12-2S and the PCI Expansion Unit
    1.  5.1 Connecting Cables to the SPARC M12-2S
    2.  5.2 Connecting Cables to the PCI Expansion Unit
    3.  5.3 Connecting Cables to the Crossbar Box
    4.  5.4 Storing Cables
  7. Chapter 6 Performing an Initial System Diagnosis
    1.  6.1 Connecting the System Management Terminal
    2. Click 6.2 Turning On the Input Power
    3.  6.3 Logging In to the XSCF
    4.  6.4 Confirming the XCP Firmware Version
    5.  6.5 Checking the Altitude Setting
    6.  6.6 Setting the Time
    7.  6.7 Performing a Diagnosis Test
    8.  6.8 Checking the Component Status
  8. Chapter 7 Making the Initial System Settings
    1.  7.1 Setting the Password Policy
    2.  7.2 Setting a User Account and Password
    3. Click 7.3 Configuring the Telnet/SSH Service
    4.  7.4 Configuring the HTTPS Service
    5. Click 7.5 Configuring the XSCF Network
    6.  7.6 Configuring Memory Mirroring
    7.  7.7 Creating a PPAR Configuration List
    8. Click 7.8 Assigning/Releasing a Physical System Board (PSB) for a Physical Partition (PPAR)
    9.  7.9 Synchronizing the Physical Partition (PPAR) Time and XSCF Time
    10. Click 7.10 Registering a CPU Activation Key
    11.  7.11 Assigning CPU Core Resources
    12. Click 7.12 Starting and Stopping a Physical Partition (PPAR)
    13.  7.13 Installing Oracle Solaris
    14. Click 7.14 Saving Configuration Information
  9. Chapter 8 Expanding a System With a Building Block Configuration
    1.  8.1 Points of Concern During Expansion
    2. Click 8.2 Preparation for Expansion
    3. Click 8.3 SPARC M12-2S Expansion Work
    4.  8.4 Incorporating the SPARC M12-2S to be Added
    5.  8.5 Initial Diagnosis of the SPARC M12-2S to be Added
  10. Chapter 9 Reducing a System With a Building Block Configuration
    1.  9.1 Points of Concern During Reduction
    2. Click 9.2 Preparation for Reduction
    3. Click 9.3 SPARC M12-2S Reduction Work
  11. Appendix A Troubleshooting
    1.  A.1 Understanding the Usual Problems and Their Corrective Actions
    2. Click A.2 Understanding Commands for Troubleshooting
    3. Click A.3 How to Restore a BB-ID From an Incorrect Setting
  12. Appendix B Cable Connection Information on Building Block Configurations
    1.  B.1 2BB Configuration (Direct Connections Between Chassis)
    2.  B.2 3BB Configuration (Direct Connections Between Chassis)
    3.  B.3 4BB Configuration (Direct Connections Between Chassis)
    4.  B.4 From the 2BB Configuration to 8BB Configuration (Connections via a Crossbar Box)
    5.  B.5 From the 9BB Configuration to 16BB Configuration (Connections via a Crossbar Box)
    6.  B.6 Power Cord Connections in Expansion Racks
  13. Appendix C Setup Command Workflow
  14. Appendix D Installation Procedure Checklist
    1.  D.1 From Installation of the 1BB Configuration to Initial Diagnosis
    2.  D.2 From Installation to Initial Diagnosis of Configuration With Direct Connections Between Chassis