B.1 Considerations for the XSCF Reboot or Failover Time
B.1 Considerations for the XSCF Reboot or Failover Time
If an XSCF restart or failover occurs when you perform physical partition dynamic reconfiguration by adding or deleting a system board (PSB<BB>), operations related to the physical partition dynamic reconfiguration may not complete. In this case, perform the following to check that the operation has been completed. If the operation has not yet been completed, add or remove the PSB (BB) by using dynamic reconfiguration again.
< Previous Page | Next Page >