5.1 Preparing Tools Required for Maintenance
5.1 Preparing Tools Required for Maintenance
This section describes the tools required for maintenance. Table 5-1 lists the tools required for maintenance on a Field Replaceable Unit (FRU).
Item | Use |
---|---|
Phillips screwdriver (No. 2) | Removing or replacing screws |
Flathead screwdriver (small) | Removing or replacing screws |
Torx screwdriver (T10) | Removing or replacing screws |
Wrist strap | For static grounding |
ESD mat | For static grounding |
< Previous Page | Next Page >