Skip to main content

20.2.1 CB Switches on the Dedicated Power Distribution Unit


20.2.1 CB Switches on the Dedicated Power Distribution Unit
The PDU has circuit breaker switches (CB switches) on it. Pull up a CB switch to cut off electricity. Push it in to have electricity supplied.
  1. - In the case of the SPARC M12-2S
    A in Figure 20-3 shows the locations of CB switches. There are six CB switches per PDU. For single-phase power feed, 8 PDUs are mounted per rack and there are 48 CB switches. For three-phase power feed, 6 PDUs are mounted per rack, and there are 36 CB switches.
    (For three-phase power feed, the number of mounted PDUs is different, but the locations of CB switches on the PDU are the same.)

    - In the case of the SPARC M10-4S
    A in Figure 20-4 shows the locations of CB switches for single-phase power feed. Also, B in Figure 20-4 shows the locations of CB switches for three-phase power feed. There are 12 CB switches per PDU, and 24 CB switches per rack.
Figure 20-3  Locations of CB Switches on the PDU (SPARC M12-2S)
Figure 20-3  Locations of CB Switches on the PDU (SPARC M12-2S)
Figure 20-4  Locations of CB Switches on the PDU (SPARC M10-4S)
Figure 20-4  Locations of CB Switches on the PDU (SPARC M10-4S)