Skip to main content

17.1 Before Maintaining the Operation Panel


17.1 Before Maintaining the Operation Panel
This chapter only has descriptions of the operation panel location and the work of removing and installing the operation panel.
Before removing a FRU, see "Chapter 7 Maintenance Flow" and perform the necessary work items.
For the types of maintenance on the operation panel, also see "Operation panel" in "Table 7-2 Types of Maintenance That Can be Applied to Each Crossbar Box FRU."