Skip to main content

9.1 Before Maintaining the Link Board


9.1 Before Maintaining the Link Board
This chapter describes only the configuration, removal work, and mounting work of a link board.
Before removal work of a FRU, perform necessary work items while referencing "Chapter 7 Maintenance Flow."
For maintenance types of the link board, see "Link board" in "Table 7-2 List of Available Maintenance Types by FRU."