Skip to main content

11.4 Installing a Link Cable


11.4 Installing a Link Cable
This section describes the procedure for installing the link cables.
  1. Hold the link cable connectors, and connect the two link cables to the link board mounted in the PCI expansion unit.
Note - Reinstall the link cables in their original positions by referring to the record you made before the start of maintenance.
Note - Confirm that the link cables are connected and firmly secured.
  1. Connect the two link cables to the link card mounted in the SPARC M12-1/M12-2/M12-2S/M10-1/M10-4/M10-4S by using the same procedure.
Note - Reinstall the link cables in their original positions by referring to the record you made before the start of maintenance.
Note - Confirm that the link cables are connected and firmly secured.
Now, the work for mounting the FRU is complete. While referencing "Chapter 7 Maintenance Flow," continue the maintenance work.