Skip to main content

Chapter 5 Preparations Required for Maintenance


Chapter 5 Preparations Required for Maintenance
This chapter describes the preparations that must be completed before you can physically remove a component. See this chapter when required to perform maintenance on any of the components described in Chapter 7 or subsequent chapters.
Caution - Do not operate a Field Replaceable Unit (FRU) requiring maintenance while OpenBoot PROM is running (the ok prompt is displayed). Turn off the power to the physical partition or start Oracle Solaris to release the PCI expansion unit from the server, and then operate the FRU requiring maintenance.