16.6.3 Restoring the Server


16.6.3 Restoring the Server
  1. Install the air duct and the PSUBP cover.
    For details, see "6.1.2 Installing the Air Duct and PSUBP Cover."
  2. Install the upper cover.
    For details, see "6.1.3 Installing the Upper Cover."
  3. Close the fan cover.
    For details, see "6.1.4 Closing the Fan Cover."
  4. Put the SPARC M12-1 into the rack.
    For details, see "6.1.5 Putting the SPARC M12-1 Into the Rack."
  5. Connect all the cables of the external interface.
Note - Reinstall the cables in their original positions by referring to the record that you made before the start of maintenance.
  1. Disconnect the XSCF LAN cables, and connect the serial cable.
  2. Connect the power cords of the SPARC M12-1 requiring maintenance at their original positions.
Note - Reinstall the power cords in their original positions by referring to the record that you made before the start of maintenance.
Note - The XSCF STANDBY LED (green) on the operation panel blinks when the power cords are connected. As the LED blinks, wait a moment for it to stay on. This indicates that XSCF initialization completed successfully.
  1. Log in to the XSCF via the serial port.
  2. Set the XSCF time.
    For details on the procedure, see "6.3.1 Setting the Time."
  3. Confirm that the XSCF reboots, and then connect the XSCF LAN cable.
Note - Reinstall the cables in their original positions by referring to the record that you made before the start of maintenance.
  1. Match the XCP firmware version with the pre-replacement version.
    For details on the procedure, see "6.3.2 Confirming the Firmware Version."
The FRU installation work is completed. See "Chapter 7 Maintenance Flow" to continue maintenance work.