Appendix C Installation Procedure Checklist
Appendix C Installation Procedure Checklist
This appendix contains a checklist of the required steps from SPARC M12-1 installation to initial diagnosis to ensure that the device setup is complete and the device is ready for use.
You can customize this checklist according to your user environment, and use it in combination with the workflow in Table 1-1 as appropriate for the system in use.
Work Description | Check | Checked By | Installation Guide Reference | |
---|---|---|---|---|
1 | Before installing the system, check the safety precautions, system specifications, and necessary conditions for installation. | [ ] | "Chapter 2 Planning and Preparing for System Installation" | |
2 | Prepare the necessary tools/information for installation. | [ ] | "3.1 Preparing the Necessary Tools/Information for Installation" | |
3 | Confirm the delivered components. | [ ] | "3.2.1 Confirming the Delivered Components of the SPARC M12-1" | |
[ ] | "3.2.2 Confirming the Delivered Components of the PCI Expansion Unit" | |||
4 | Install the rack. | [ ] | "2.4.1 Mounting Conditions for General Racks" "3.3 Confirming the Rack" |
|
5 | Mount the SPARC M12-1 in the rack. | [ ] | "3.4.1 Mounting the SPARC M12-1 in a Rack" | |
6 | If there is a PCI expansion unit, mount it in the rack. | [ ] | "3.4.2 Mounting the PCI Expansion Unit in a Rack" | |
7 | After mounting the SPARC M12-1, confirm the complete contact (complete engagement) of the power supply units and internal storage. |
[ ] | ||
8 | If there are optional components, mount them in the SPARC M12-1 and PCI expansion unit. (For details, see the service manual.) |
[ ] | "3.5.1 Mounting Optional Components in the SPARC M12-1" "3.5.2 Mounting Optional Components in the PCI Expansion Unit" In the Fujitsu SPARC M12-1 Service Manual: "Chapter 8 Maintaining the PCI Express Cards" "Chapter 9 Maintaining Internal Storage" "Chapter 16 Maintaining the Motherboard Unit/Memory" |
|
9 | Connect serial cables, LAN cables, and power cords to the SPARC M12-1. | [ ] | "4.1 Connecting Cables to the SPARC M12-1" | |
10 | Connect the link cable and management cable to the PCI expansion unit and the SPARC M12-1. Attach the core to the power cord, and connect the power cord to the PCI expansion unit. |
[ ] | "4.2 Connecting Cables to the PCI Expansion Unit" | |
11 | Connect the system management terminal to the SPARC M12-1. | [ ] | "5.1 Connecting the System Management Terminal to the Chassis" | |
12 | Turn on the input power, and check the status with the LED display on the XSCF unit. | [ ] | "5.2 Turning On the Input Power and Starting the XSCF" | |
13 | Log in to the XSCF. | [ ] | "5.3 Logging In to the XSCF" | |
14 | Check the XCP version. | [ ] | "5.4 Checking the XCP Version" | |
15 | Set the altitude. | [ ] | "5.5 Checking the Altitude Setting" | |
16 | Set the time. | [ ] | "5.6 Setting the Time" | |
17 | Perform the initial diagnosis test on the hardware. (*1) | [ ] | "5.7 Performing a Diagnosis Test" | |
18 | Confirm that that each component is normally recognized, and no errors occur. | [ ] | "5.8 Checking the Component Status" | |
*1 The probe-scsi-all command and the show-devs command are displayed with command options for the diagnosis test. Confirm that the capacity and number of installed disks and the installation locations and device names of PCI Express cards are correct. |