Skip to main content
  1. Home >
  2. Products >
  3. Computing Products >
  4. Servers >
  5. Fujitsu SPARC servers >
  6. Downloads >
  7. User Manuals >
  8. Fujitsu SPARC M12-1 Installation Guide >
  9. 3.1 Preparing the Necessary Tools/Information for Installation

3.1 Preparing the Necessary Tools/Information for Installation


3.1 Preparing the Necessary Tools/Information for Installation
This section describes the tools and information that are required in installation. Have these prepared before starting installation work.
Table 3-1  List of Necessary Tools
Name Use
Phillips screwdriver (#2) Used to attach cable support brackets and mount optional components
Stepladder Used for mounting at high locations in racks
ESD mat and antistatic wrist strap Used in the work of mounting optional components
Lifter
(hydraulic or mechanical jack)
Used in the work of mounting chassis in racks
System management terminal
(ASCII terminal, workstation, terminal server, patch panel connected to terminal server, etc.)
Used to connect to the XSCF and for the work of checking and configuring the XSCF firmware