Manual Code: C120-0020-11
Fujitsu M10-1/SPARC M10-1 Installation Guide
Contents
- Preface
- Chapter 1 Understanding the Installation Flow
- Chapter 2 Planning and Preparing for System Installation
- 2.1 Safety Precautions
- 2.2 Items Requiring Confirmation Before Installation
- 2.3 Confirming the Physical Specifications of the System
- 2.4 Confirming Rack Specifications
- 2.5 Checking Environmental Conditions
- 2.6 Checking Acoustic Noise Levels
- 2.7 Checking Cooling Conditions
- 2.8 Checking the Power Input Type
- 2.9 Preparing Power Supply Facilities
- 2.10 Checking External Interface Port Specifications
- 2.11 Checking the Functions of the Operation Panel
- Chapter 3 Installing the System
- Chapter 4 Connecting Cables to the Chassis
- Chapter 5 Performing an Initial System Diagnosis
- Chapter 6 Making the Initial System Settings
- 6.1 Setting the Password Policy
- 6.2 Setting a User Account and Password
- 6.3 Configuring the Telnet/SSH Service
- 6.4 Configuring the HTTPS Service
- 6.5 Configuring the XSCF Network
- 6.6 Configuring Memory Mirroring
- 6.7 Creating a Physical Partition Configuration List (PCL)
- 6.8 Confirming That a System Board (PSB) is Assigned to a Physical Partition (PPAR)
- 6.9 Setting a CPU Operational Mode for the Physical Partition
- 6.10 Synchronizing the Physical Partition (PPAR) Time and XSCF Time
- 6.11 Registering a CPU Activation Key
- 6.12 Assigning CPU Core Resources to a Physical Partition
- 6.13 Starting and Stopping a Physical Partition (PPAR)
- 6.14 Saving Configuration Information
- Appendix A Troubleshooting
- Appendix B Setup Command Workflow
- Appendix C Installation Procedure Checklist