Skip to main content

Appendix C Installation Procedure Checklist


Appendix C Installation Procedure Checklist
This section contains a checklist of the required steps from SPARC M10-1 installation to initial diagnosis to ensure that the device setup is complete and the device is ready for use.
You can customize this checklist according to your use environment, and use it in combination with the workflow in Table 1-1.
Table C-1  SPARC M10-1 Workflow (from Installation to Initial Diagnosis)
Work description Check Checked by Installation Guide reference
1. Before installing the system, check the safety precautions, system specifications, and necessary conditions for installation. [   ]   "Chapter 2 Planning and Preparing for System Installation"
2. Prepare the necessary tools/information for installation. [   ]   "3.1 Preparing the Necessary Tools/Information for Installation"
3. Confirm the delivered components. [   ]   "3.2.1 Confirming the delivered components of the SPARC M10-1"
    [   ]   "3.2.2 Confirming the delivered components of the PCI expansion unit"
4. Install the rack. [   ]   "2.4.1 Mounting conditions for general racks"
"3.3 Confirming the Rack"
5. Mount the SPARC M10-1 in the rack. [   ]   "3.4.1 Mounting the SPARC M10-1 in a rack"
6. If there is a PCI expansion unit, mount it in the rack. [   ]   "3.4.2 Mounting the PCI expansion unit in a rack"
7. After mounting the SPARC M10-1, confirm the complete contact (complete engagement) of the power supply unit and internal disk.

[   ]    
8. If there are optional components, mount them on the SPARC M10-1 and the PCI expansion unit.
(For details, see the service manual.)
[   ]   "3.5.1 Mounting optional components in the SPARC M10-1"
"3.5.2 Mounting optional components in the PCI expansion unit"

In the Fujitsu M10-1/SPARC M10-1 Service Manual:
"Chapter 8 Maintaining the PCI Express Cards"
"Chapter 9 Maintaining the Internal Disks"
"Chapter 16 Maintaining the Motherboard Unit/Memory"
9. Connect serial cables, LAN cables, and power cords to the SPARC M10-1. [   ]   "4.1 Connecting Cables to the SPARC M10-1"
10. Connect the link cable and management cable to the PCI expansion unit and the SPARC M10-1.
Attach the core to the power cord, and connect the power cord to the PCI expansion unit.
[   ]   "4.2 Connecting Cables to the PCI Expansion Unit"
11. Connect the system management terminal to the SPARC M10-1. [   ]   "5.1 Connecting the System Management Terminal to the Chassis"
12. Turn on the input power, and check the status from the LED display on the XSCF unit. [   ]   "5.2 Turning On the Input Power and Starting the XSCF"
13. Log in to the XSCF. [   ]   "5.3 Logging In to the XSCF"
14. Check the XCP version. [   ]   "5.4 Checking the XCP Version"
15. Set the altitude. [   ]   "5.5 Checking the Altitude Setting"
 * There is no need to set the altitude if it is unknown.
16. Set the time. [   ]   "5.6 Checking the Time Setting"
17. Perform the initial diagnosis test. [   ]   "5.7 Performing a Diagnosis Test"
 The probe-scsi-all command and the show-devs command are displayed as command options in the diagnosis test.

 Confirm that the installed disk capacity and number of units, and the installation position and device name of the PCI Express card are correct.
18. Confirm that that each component is normally recognized, and no errors occur. [   ]   "5.8 Checking the Component Status"