Chapter 2 Planning and Preparing for System Installation
Chapter 2 Planning and Preparing for System Installation
This chapter describes what should be checked when planning SPARC M10 system installation. Before installation, you need to understand the system configuration and obtain all the information that will become prerequisite conditions for installation.
- Safety Precautions
- Items Requiring Confirmation Before Installation
- Confirming the Physical Specifications of the System
- Confirming Rack Specifications
- Checking Environmental Conditions
- Checking Acoustic Noise Levels
- Checking Cooling Conditions
- Checking the Power Input Type
- Preparing Power Supply Facilities
- Checking External Interface Port Specifications
- Checking the Functions of the Operation Panel